Sinostorage 1MW/2MWh bess solution is pre-engineered and manufactured to be ready to install. This solution adopt the smart string topology design, and can allows for better system availability and lower maintenance downtimes. The system utilize one power conversion system * a battery cluster string parameters better charging efficiency and the potential for less circulating current found in some centralized BESS designs.
With 280Ah LFP cell, the 1mw bess system install into a 20 foot container. Our solution can support On grid, Off grid, Hybrid grid power supply method, and it is an ideal solution for commercial & industrial side, power generation side, gride side.